Your needs · Industrial workshops

Workshop noise doesn't have to be a fact of life

Machines, impacts, forklifts, metal walls: in a workshop, sound reflects off every surface and adds to the direct noise of the workstations. It is this reflected part that can be eliminated.

Acoustic clouds suspended beneath roof framing

You don't make a machine silent by treating the walls. You remove the reverberant field, meaning all the noise that isn't the machine you're working at.

What's at stake

Three reasons to act

01

The 85 dB threshold

In France, from 85 dB(A) over 8 hours, the employer must implement a noise reduction programme. Acoustic correction of the room is the first lever, before personal protection.

02

Understood without shouting

Safety instructions, alarms, communication between operators: in an overly reverberant room, intelligibility drops, and safety with it.

03

A site in operation

Our objects hang from existing structures, roof framing or cable trays, without stopping production or altering the building.

The proof

Avant, après, mesuré

320 m² workshop, steel frame, metal cladding. 22 suspended clouds in two layers.

Before, after

UntreatedRT 2.6 s
After installationRT 1.2 s

Reverberation time according to the Sabine model. Results vary with volume, materials and use; validated on site by before / after measurement.

What French regulations require

Regulatory action threshold (France)
85 dB(A) over 8 h
Exposure limit value
87 dB(A) over 8 h
Target spatial sound decay
DL2 ≥ 3 dB
Workshop, technical room
RT ≤ 1.5 s
Reference (France)
French Labour Code, art. R4431-1 et seq.

Premises that need treatment?

On-site exposure measurement, treatment sizing, check after installation. Without stopping production.

Request an acoustic survey